Detailed design of a 3rd line
railway project between Palwal and Bhuteshwar (81
Kms) for Rail Vikas Nigam Limited. Cost of project
INR 350 Crores
This project is of
the 3rd line on Delhi-Mumbai trunk route of Indian
Railways, which is electrified with 25Kv AC and has
latest signaling and telecommunication facilities
like Electronic Interlocking and Automatic
permissive block and Optic Fiber cables.
Project Management
Consultancy of the above mentioned project.
Proof checking of design and
site supervision of important bridges across river
Chenab (cost INR 500 crores) and Anji Khad (cost INR
250 crores) in J & K.
The above bridges are steel arch bridges alongwith
viaducts on approaches, arch spans being 485m and
265m respectively. This project is in JV with parent
company Scott Wilson U.K and Flint & Neill
Partnership, U.K.
Preparation of Technical
Specifications and Bill of Quantities for signaling
and telecom works of Rewari Ajmer guage conversion
project (300 Kms length) for Wilbursmith Associates
Pvt Ltd (Cost INR 65 crores)
Project Management Consultancy
of a new rail link between Bhadrak to Dhamra to a
private port at Dhamra on Eastern Coast (length of
rail link – 61 Kms and Project Cost INR 400 crores).
Tata and L&T are executing this
project in a 50:50 Joint Venture.
Detailed Design for Railway
Electrification, General Electrical Services of the
New Rail Link between Bhadrak-Dhamra Port (Rs. 65
Crores)
Detailed Design for Signalling
and Telecommunications for Bhadrak-Dhamra Port (61
Kms) Rail Link (Rs. 23 Crores)
Methodology for working the new
rail link of Bhadrak to Dhamra on Public Private
Participation (PPP) Model.
Realignment of Railway tracks
for West Coast Route modernization between London
and Glasgow. The design is being carried out using
specialized software MX Rail on behalf of Scott
Wilson Railways, U.K